ZAMCELCO CSP for 85MW Baseload
DOE Microgrid Systems Provider (MGSP) - CSP 2024
Invitation to Bid MGSP-CSP 2024 | |||
Terms of Reference MGSP-CSP 2024 | |||
TOR Annex G_ Microgrid System Provider Service Contract (MSC) | |||
Evaluation Criteria 2024: |
○ MGSP Evaluation Criteria Form CANORECO 1.pdf
○ MGSP Evaluation Criteria Form CANORECO 2.pdf
○ Lot 34 Clustering and Evaluation Criteria Guinawayan Placer Masbate.pdf
○ Lot 35 Clustering and Evaluation Criteria Naboctot Placer Masbate.pdf
○ Lot 36 Clustering and Evaluation Criteria Ki-Buaya San Pascual Masbate.pdf
○ Lot 37 Clustering and Evaluation Criteria Quintina San Pascual Masbate.pdf
○ Lot 39 - Manalipa - Evaluation Criteria Form.pdf
ORMECO CSP for 57MW GUARANTEED DEPENDABLE CAPACITY (GDC) POWER SUPPLY
INVITATION TO BID - CSP | |||
BID BULLETIN NO. 2024-01 - Amendments to the Bidding Documents | |||
BID BULLETIN NO. 2024-02 - Postponement and Rescheduling of Opening and Submission of Bids |
Luzon EC Aggregation CSP
PELCO I CSP for 45MW Power Supply Requirements
BISELCO 2024 CSP FOR 24MW FOR CORON AND BUSUANGA
ANTECO - SEMIRARA CSP 2024
INVITATION TO BID for CSP | |||
Bid Bulletin No. 01 | |||
Bid Bulletin No. 02 | |||
Bid Bulletin No. 03 | |||
Bid Bulletin No. 04 | |||
Bid Bulletin No. 05 | |||
Bid Bulletin No. 06 |
NECA- CSP ITB 53MW Baseload and 18MW Peaking Power Supply 2024
NEA-PALECO CSP 40MW Baseload and 15MW Peaking
R8 JCPSP - Invitation to Bid and Terms of Reference
CEBECO II - Invitation to Bid for CSP
LEYECO II PSCSP - INVITATION TO BID
PALECO-El Nido CSP - Invitation to Bid
INVITATION TO BID - CSP | |||
SUPPLEMENTAL BID BULLETIN NO. 1 | |||
SUPPLEMENTAL BID BULLETIN NO. 2 | |||
SUPPLEMENTAL BID BULLETIN NO. 3 | |||
SUPPLEMENTAL BID BULLETIN NO. 4 | |||
SUPPLEMENTAL BID BULLETIN NO. 5 |
ESAMELCO Competitive Power Supply Procurement (ECPSP) for RPS Power Supply (2024-2049) (SECOND BIDDING)
INVITATION TO BID - CSP | |||
INVITATION TO BID - CSP (For Negotiation) | |||
Notice of Failure of the Negotiated Procurement under ESAMELCO CSP |
QUEZELCO I CSP - Invitation to Bid
BENECO CSP - Invitation to Bid
BASELCO CSP - 18.5MW Baseload Power Supply Requirement
FRECOR 8 - Invitation to Bid for CSP (2nd Round)
CEBECO I CSP ITB - 11 MW Baseload PowerSupply Requirernentfor2023to 2033.
ESAMELCO Competitive Power Supply Procurement (ECPSP) for RPS Power Supply (2024-2049)
BID BULLETIN NO. 2 | |||
BID BULLETIN NO. 1 | |||
ITB FOR ESAMELCO Competitive Power Supply Procurement (ECPSP) | |||
ESAMELCO-RPS_TOR |
FRECOR 8 - Invitation to Bid for CSP
QUEZELCO II - Invitation to Bid for CSP 2023
SOCOTECO II - ITB FOR NEGOTIATION OF CSP - 85,000 MWH/YR INTENDED FOR RENEWABLE PORTFOLIO STANDARD (RPS)
ZANECO - CSP ITB - Negotiated Procurement of 10MW Renewable Energy
CSP - Invitation to Bid (August 18, 2023) | |||
BID BULLETIN NO.1- NEGOTIATED PROCUREMENT | |||
BID BULLETIN No 2- NEGOTIATED PROCUREMENT |
SORECO II - CSP ITB
NOCECO CSP - Bid 10MW ower Supply Requirement for 10 Years
CASURECO II Competitive Selection Process for the procurement of 20MW power supply requirement
CASURECO II CSP-ITB |
Bid and Bid Bulletin No. 1 |
Bid and Bid Bulletin No. 2 |
Bid and Bid Bulletin No. 3 |
Bid and Bid Bulletin No. 4 |
PANAY GUIMARAS EC POWER CONSORTIUM INC. (PGECPCI) - ITB for Secong Round of CSP Lots 1,2, and 3
CENPELCO - CSP ITB
CENECO’s 20 MW Base Load Power Supply Requirement for 2023 to 2033
ZANECO - CSP ITB
NOTICE OF FAILURE OF BIDDING-January 06 2023 | |||
SUPPLEMENTAL BID BULLETIN No. 2 | |||
SUPPLEMENTAL BID BULLETIN No. 1 | |||
INVITATION TO BID for CSP |
ORMECO CSP for the construction, installation, operation, and maintenance of power plants for the 41MW Guaranteed Dependable Capacity
Filename | Size | Date & Time |
---|---|---|
Approved FINAL TOR for 41MW | 1.29 MB | 2022-11-19 06:09:33 |
INVITATION TO BID | 270.03 KB | 2022-11-19 06:10:18 |
SCHEDULE OF CSP | 229.88 KB | 2022-11-19 06:10:48 |
SUPPLY DEMAND 2023-2030 | 19.19 KB | 2022-12-19 17:36:56 |
FIFTH SCHEDULE. MEASUREMENT AND RECORDING OF ENERGY CONSUMPTION | 126.42 KB | 2022-12-19 17:36:56 |
BID BULLETIN NO. 3 | 722.25 KB | 2022-12-19 17:36:56 |
BID BULLETIN NO. 2 | 92.97 KB | 2022-12-19 17:36:56 |
SECOND SCHEDULE. OPERATING PARAMETERS | 140.75 KB | 2022-12-19 17:36:56 |
Draft PSA | 711.51 KB | 2022-12-19 17:36:56 |
TOTAL GRID_SLD | 256.92 KB | 2022-12-19 17:36:56 |
BID BULLETIN NO. 1 | 238.78 KB | 2022-12-19 17:36:56 |
FOURTH SCHEDULE. ELECTRICITY DELIVERY PROCEDURES | 122.41 KB | 2022-12-19 17:36:56 |
FIRST SCHEDULE. POWER SUPPLY SCOPE AND SPECIFICATIONS | 145.5 KB | 2022-12-19 17:36:56 |
SIXTH SCHEDULE. FEES AND ADJUSTMENTS | 201.72 KB | 2022-12-19 17:36:56 |
Proposed Locations | 443.48 KB | 2022-12-19 17:36:56 |
THIRD SCHEDULE. FUEL SPECIFICATIONS | 104.06 KB | 2022-12-19 17:36:56 |
ANNEX I | 145.65 KB | 2022-12-19 17:36:56 |
SIS for 41MW Power Supply | 1.51 MB | 2022-12-19 17:50:41 |
ALECO CPSP for the Base, Intermediate and Peaking capacity Supply for a term of fifteen (15) years, Aggregate Contract Capacity of 100 MW
R1+CAR+S1 ECs - Joint CSP for the Short-Term (2022-2025)
SUPPLEMENTAL BID BULLETIN No. 3 | |||
SUPPLEMENTAL BID BULLETIN No. 2 | |||
SUPPLEMENTAL BID BULLETIN No. 1 | |||
INVITATION TO BID for CSP |
BATELEC II CSP - BID Supply of Twenty Megawatts (20MW) Additional Capacity
TIELCO CSP - BID Firm 13.7 MW with N-1 and a three-year phase-in period for 11 years
BID BULLETIN No. 7 | |||
BID BULLETIN No. 6 | |||
BID BULLETIN No. 5 | |||
BID BULLETIN No. 4 | |||
BID BULLETIN No. 3 | |||
BID BULLETIN No. 2 | |||
BID BULLETIN No. 1 | |||
TERMS OF REFERENCE (TOR) | |||
INVITATION TO BID for CSP |
SOCOTECO II ITB for CSP - 85,000 MWH/YR INTENDED FOR RENEWABLE PORTFOLIO STANDARD (RPS), COD 2024
PANELCO III - CSP ITB
CASURECO IV - CSP ITB
PANAY GUIMARAS EC POWER CONSORTIUM INC. (PGECPCI) - CSP BID
QUEZELCO I CSP - Bid 5 MW Baseload with 1 MW Yearly increment for a period of sixty six (66) months
SOCOTECO II ITB for CSP - 85,000 MWh/yr to commence on 2023
BULLETIN NO. 04 | ||||
ERRATUM TO BID BULLETIN NO. 03 | ||||
BID BULLETIN NO. 03 | ||||
BID BULLETIN NO. 02 | ||||
INVITATION TO BID for CSP | November 19, 2021 |
ZAMSURECO I ITB for CSP - 5 MW of intermediate renewable energy for 25 Years
INVITATION TO BID for CSP | September 24, 2021 |
OMECO ITB for CSP - SAMARICA Area for the year 2022-2026
#02 | Bid Bulletin No. 02 | September 17, 2021 | ||
#01 | Bid Bulletin No. 01 | September 16, 2021 | ||
# | INVITATION TO BID for CSP | August 17, 2021 |
QUIRELCO ITB for CSP - 15 MW FULL LOAD Power Supply for five (5) years.
# | Terms of Reference CSP 2021-01 | July 26, 2021 | ||
# | CSP INVITATION TO BID | July 26, 2021 |
PANELCO I ITB for CSP - 5MW PEAKING LOAD REQUIREMENT for 15 YEAR
#02 | BID BULLETIN No. 02 | August 05, 2021 | ||
#01 | BID BULLETIN No. 01 | July 21, 2021 | ||
# | INVITATION TO BID | June 26, 2021 |
ISELCO I CSP for 19 MW for a period of ten (10) years
# | INVITATION TO BID | June 23, 2021 |
PELCO I's 36MW Baseload thru Power Supply Agreement (PSA).
#06 | Supplemental Bid Bulletin No. 2021-07 | JUNE 22, 2021 | ||
#06 | Supplemental Bid Bulletin No. 2021-06 | JUNE 17, 2021 | ||
#05 | Supplemental Bid Bulletin No. 2021-05 | JUNE 16, 2021 | ||
#04 | Supplemental Bid Bulletin No. 2021-04 | JUNE 08, 2021 | ||
#03 | Supplemental Bid Bulletin No. 2021-03 | JUNE 04, 2021 | ||
#02 | Supplemental Bid Bulletin No. 2021-02 | JUNE 02, 2021 | ||
#01 | Supplemental Bid Bulletin No. 2021-01 | MAY 27, 2021 | ||
INVITATION TO BID | APRIL15, 2021 |
IFELCO's 7.5 MW Base Load Power Supply Requirement for Nine (9) years
#05 | Supplemental Bid Bulletin No. 2021-06 | JUNE 02, 2021 | ||
#04 | Supplemental Bid Bulletin No. 2021-05 | MAY 21, 2021 | ||
#03 | Supplemental Bid Bulletin No. 2021-03 | MAY 12, 2021 | ||
#02 | Supplemental Bid Bulletin No. 2021-02 | APRIL 21, 2021 | ||
#01 | INVITATION TO BID | APRIL 14, 2021 |
ORMECO's CSP for the 15MW Interim Power Supply
#06 | ANNEX G - Demand Profile | MARCH 28, 2021 | ||
#05 | ORMECO Bid Bulletin No. 03 | MARCH 28, 2021 | ||
#04 | ORMECO Bid Bulletin No. 02 | MARCH 28, 2021 | ||
#03 | ORMECO Bid Bulletin No. 01 | MARCH 23, 2021 | ||
#02 | TERMS OF REFERENCE (TOR) | MARCH 04, 2021 | ||
#01 | INVITATION TO BID | MARCH 04, 2021 |
CANORECO's CSP FOR 63 MW - 15 YEARS (REPOST MARCH 8, 2021)
#09 | Supplemental Bid Bulletin No. 2021-01A | JUNE 23, 2021 | ||
#08 | RE-POST - REVISED INVITATION TO BID | JUNE 1, 2021 | ||
#07 | Supplemental Bid Bulletin No. 2021-03 | APRIL 20, 2021 | ||
#06 | REVISED INVITATION TO BID (ITB) | MARCH 23, 2021 | ||
#05 | Supplemental Bid Bulletin No. 2021-02 | MARCH 23, 2021 | ||
#04 | RE-POST INVITATION TO BID | MARCH 08, 2021 | ||
#03 | Supplemental Bid Bulletin No. 2021-01 | MARCH 08, 2021 | ||
#02 | TERMS OF REFERENCE (TOR) | MARCH 01, 2021 | ||
#01 | INVITATION TO BID | MARCH 01, 2021 |
BATELEC II CSP 5WM FIRM AND 5MW RENEWABLE TOR
#01 | Competitive Selection Process Timeline |
#02 | TOR for Baseload Requirements - Power Supply Agreement "PSA" |
#03 | TOR for Renewable Portfolio Standard Compliance - Power Supply Agreement "PSA" |
#03 | |
#04 | |
#05 | |
#06 | |
#07 | |
#08 |
BOHECO I CSP for 1.6-MW additional Long-Term (2021-2031)
#03 | BOHECO I Bid Bulletin No. 1 | MARCH 01, 2021 | ||
#02 | TERMS OF REFERENCE (TOR) | OCTOBER 19, 2020 | ||
#01 | INVITATION TO BID | OCTOBER 19, 2020 |
NEECO II - AREA 2 CSP for 37MW
#05 | BID BULLETIN NO. 6 | NOVEMBER 06, 2020 | ||
#05 | BID BULLETIN NO. 5 | OCTOBER 27, 2020 | ||
#04 | BID BULLETIN NO. 4 | OCTOBER 21, 2020 | ||
#04 | BID BULLETIN NO. 3 | OCTOBER 2, 2020 | ||
#03 | TERMS OF REFERENCE (TOR) | SEPTEMBER 7, 2020 | ||
#02 | BID TIMELINE | SEPTEMBER 7, 2020 | ||
#01 | INVITATION TO BID | SEPTEMBER 7, 2020 |
One Bohol Power DU Joint CSP from 12 MW up to 15 MW - 10 years
#08 | BID BULLETIN NO. 06-2020 | NOVEMBER 06, 2020 | ||
#07 | BID BULLETIN NO. 05-2020 | NOVEMBER 3, 2020 | ||
#06 | BID BULLETIN NO. 04-2020 | NOVEMBER 3, 2020 | ||
#05 | BID BULLETIN NO. 03-2020 | OCTOBER 28, 2020 | ||
#04 | BID BULLETIN NO. 02A-2020 | OCTOBER 23, 2020 | ||
#03 | BID BULLETIN NO. 02-2020 | OCTOBER 23, 2020 | ||
#02 | TERMS OF REFERENCE (TOR) | AUGUST 31, 2020 | ||
#01 | INVITATION TO BID | AUGUST 31, 2020 |
CAGELCO II CSP for 10MW from 2020 to 2022 and 15MW from 2022 to 2037
#04 | Supplemental Bulletin No. 04 | SEPTEMBER 15, 2020 | ||
#03 | Supplemental Bulletin No. 03 | SEPTEMBER 10, 2020 |
#02 | TERMS OF REFERENCE (TOR) | AUGUST 16, 2020 | ||
#01 | INVITATION TO BID | AUGUST 16, 2020 |
QUIRELCO CSP for 15MW
#01 | INVITATION TO BID | JULY 16, 2020 |
PELCO II CSP for 15MW - 15 Years / Supplemental Bulletin - 40MW Baseload Energy
#08 | PELCO II Supplemental Bulletin No. 2020 - 1-8 40MW Baseload Energy | September 02, 2020 | ||
#07 | PELCO II Supplemental Bulletin No. 2020 - 1-9 40MW Baseload Energy | September 02, 2020 | ||
#06 | PELCO II Supplemental Bulletin No. 02-07 40MW Baseload Energy | August 20, 2020 | ||
#05 | PELCO II Supplemental Bulletin No. 001 - 40MW Baseload Energy | August 06, 2020 | ||
#04 | Supplemental Bulletin No. 001-13 | |||
#03 | Supplemental Bulletin No. 001-9 | |||
#02 | Supplemental Bulletin No. 001 | |||
#01 | TERMS OF REFERENCE |
NEECO II AREA 1 TOR AND CSP ACTIVITY
#02 | ||||
#01 | INVITATION TO BID | MARCH 18, 2020 |
NEECO I CSP for 3MW - 5 Years
EC | CSP Activity | Demand (MW) Energy (MWh) | Contract Period | TOR |
NEECO I | Publication of Invitation to Pre-Qualification and Bid Date: January 13 and 23, 2020 Venue: NEECO I Board Room, MCO Building, Brgy. Malapit, San Isidro, Nueva Ecija | 3 MW | 5 years | NEECO 1 – TOR FOR 3MW |
Accreditation of Interested Bidders Date: January 24 – February 10, 2020 Time: 8:00 am to 5:00 pm Venue: NEECO I Board Room, MCO Building, Brgy. Malapit, San Isidro, Nueva Ecija | ||||
Issuance of Information Memorandum/Bid Documents Date: January 24 – February 10, 2020 Time: 8:00 am to 5:00 pm Venue: NEECO I Board Room, MCO Building, Brgy. Malapit, San Isidro, Nueva Ecija | ||||
Pre Bidding Conference Date: February 11, 2020 Time: 10:00 am Venue: NEECO I Board Room, MCO Building, Brgy. Malapit, San Isidro, Nueva Ecija | ||||
| Last Day of Issuance of Due Diligence Date: February 19, 2020 Venue: NEECO I Board Room, MCO Building, Brgy. Malapit, San Isidro, Nueva Ecija | |||
| Submission and Opening of Technical and Financial Bids Date: February 20, 2020 Venue: NEECO I Board Room, MCO Building, Brgy. Malapit, San Isidro, Nueva Ecija | |||
| Evaluation of Technical and Financial Bids Date: February 21, 2020 Venue: NEECO I Board Room, MCO Building, Brgy. Malapit, San Isidro, Nueva Ecija | |||
| Post Qualifications Date: February 22, 2020 – March 12, 2020 Venue: NEECO I Board Room, MCO Building, Brgy. Malapit, San Isidro, Nueva Ecija | |||
| Announcement of Winning Bidder/Sending of Notice of Award Date: March 13-16, 2020 Venue: NEECO I Board Room, MCO Building, Brgy. Malapit, San Isidro, Nueva Ecija |
OUEZELCO II TPBAC - CSP Advertisement
Re-Advertisement ISELCO II CSP For 11.3MW - 15 Years
01 | Bid Bulletin No. 01 | NOVEMBER 29, 2019 | ||
EC | CSP Activity | Demand (MW)Energy (MWh) | Contract Period | TOR |
ISELCO II | Release of Invitation to Bid (Publication) Date: October 10, 2019 and October 20, 2019 Venue: ISELCO II Office, Alibagu, City of Ilagan, Isabela | 11.3 MW | 15 years unless earlier terminated in accordance with the provision of the PSA | |
Issuance or Availability of Bid Documents Date: October 21 to November 05, 2019 Venue: ISELCO II Office, Alibagu, City of Ilagan, Isabela | ||||
Pre-bid Conference Date: November 6, 2019 Time: 1:00 PM Venue: ISELCO II Office, Alibagu, City of Ilagan, Isabela | ||||
Issuance of Bid Bulletin/s, if required Date: November 11, 2019 Venue: ISELCO II Office, Alibagu, City of Ilagan, Isabela | ||||
Due Diligence of Proponent Date: November 07-14, 2019 | ||||
Submission and Opening of Technical and Financial Bids Date: November 15, 2019 Time: 10:00am Venue: ISELCO II Office, Alibagu, City of Ilagan, Isabela | ||||
Evaluation on Submitted Bids Date: November 18, 2019 | ||||
Post Qualification and Detailed Evaluation of Bids Date: November 19-23, 2019 | ||||
Issuance of Notice of Award to Winning Bidder Date: November 27, 2019 |
PELCO I CSP For 15 MW - 10Years
#07 | Notice of Award | MARCH 4, 2020 | ||
#06 | Supplemental Bulletin No. 06 | JANUARY 06, 2020 | ||
#05 | Supplemental Bulletin No. 05 | JANUARY 02, 2020 | ||
#04 | Supplemental Bulletin No. 04 | DECEMBER 10, 2019 | ||
#03 | Supplemental Bulletin No. 03 | NOVEMBER 20, 2019 | ||
#02 | Supplemental Bulletin No. 02 | NOVEMBER 04, 2019 | ||
#01 | Supplemental Bulletin No. 01 | OCTOBER 28, 2019 | ||
EC | CSP Activity | Demand (MW) Energy (MWh) | Contract Period | TOR |
PELCO I | Publication of Invitation to Bid Date: October 4 and 11, 2019 | 15 MW | 10 years | |
Issuance of Bid Documents Date: October 9 – 24, 2019 Venue: 8:00AM – 5:00PM TPBAC Secretariat at PELCO I Main Office, Sto. Domingo, Mexico, Pampanga | ||||
Pre Bid Conference Date: October 25, 2019 Time: 10:00am Venue: ES Bueno Hall, PELCO I, Sto. Domingo, Mexico, Pampanga | ||||
Issuance of Bid Bulletin Date: October 25 to November 5, 2019 | ||||
Due Diligence of Proponents Date: October 28, 2019 10:00AM – 2:00PM ES Bueno Hall, PELCO I, Sto. Domingo, Mexico, Pampanga | ||||
Submission and Opening of Bids Date: November 12, 2019 Venue: ES Bueno Hall, PELCO I, Sto. Domingo, Mexico, Pampanga | ||||
Evaluation of Bids Date: November 13 to 15, 2019 | ||||
Post Qualification of Bids Date: November 18 to 22, 2019 | ||||
Issuance of Notice of Award to the Winning Bidder Date: November 25 to 27, 2019 |
MARELCO CSP For 16MW - 15 Years
SEPTEMBER 22, 2023 | ||||
14 | SEPTEMBER 22, 2023 | |||
13 | JULY 10, 2020 | |||
12 | MARCH 17, 2020 | |||
11 | MARCH 10, 2020 | |||
10 | Bid Bulletin No. 10 | MARCH 10, 2020 | ||
09 | Bid Bulletin No. 09 | JANUARY 03, 2020 | ||
08 | Bid Bulletin No. 08 | DECEMBER 06, 2019 | ||
07 | Bid Bulletin No. 07 | NOVEMBER 30, 2019 | ||
06 | Bid Bulletin No. 06 | NOVEMBER 29, 2019 | ||
05 | Bid Bulletin No. 05 | NOVEMBER 13, 2019 | ||
04 | Bid Bulletin No. 04 | NOVEMBER 07, 2019 | ||
03 | Bid Bulletin No. 03 | NOVEMBER 04, 2019 | ||
02 | Bid Bulletin No. 02 | OCTOBER 30, 2019 | ||
01 | Bid Bulletin No. 01 | SEPTEMBER 24, 2019 | ||
EC | CSP Activity | Demand (MW) Energy (MWh) | Contract Period | TOR |
MARELCO | Publication of Invitation to Bid Date: August 03 and 10, 2019 Venue: MARELCO Main Office | 16 MW | 15 years | |
Issuance of Bid Documents Date: August 05 to 16, 2019 Venue: MARELCO Main Office | ||||
Pre Bidding Conference of Qualified Bidders Date: August 28, 2019 Time: 10:00am Venue: MARELCO Main Office | ||||
Due Diligence by the Bidder Date: August 28 to September 28, 2019 Venue: MARELCO Main Office | ||||
Deadline of Submission of Comments /Requests for Clarifications Date: September 27, 2019 Venue: MARELCO Main Office | ||||
Issuance of Supplemental/Final Bid Bulletin Date: October 7, 2019 Venue: MARELCO Main Office | ||||
Deadline of Submission and Opening of Bids Date: October 14, 2019 Venue: MARELCO Main Office | ||||
Last Day of Bid Evaluation and Issuance of Notice to Bidder with Lowest Calculated Bid Date: October 21, 2019 Venue: MARELCO Main Office | ||||
Last Day of Submission of Post Qualification Requirements Date: October 28, 2019 Venue: MARELCO Main Office | ||||
Confirmation and Announcement of Winning Bidder Date: November 14, 2019 |
|
|
| |
Negotiation and Finalization of Power Supply Agreement Date: November 15 to 25, 2019 | ||||
Award of Contract Date: November 25, 2019 | ||||
Last day of submission of Performance Security and Signing of Power Supply Agreement Date: December 6, 2019 | ||||
Issuance of Notice to Proceed to Winning Bidder Date: December 13, 2019 | ||||
Joint Application of PSA for ERC Approval Date: December 27, 2019 |
OMECO CSP For 42MW - 15 Years
37 | JULY 07, 2021 | ||
36 | JULY 08, 2021 | ||
35 | JUNE 25, 2021 | ||
34 | JUNE 18, 2021 | ||
33 | JUNE 16, 2021 | ||
32 | APRIL 15, 2021 | ||
31 | APRIL 08, 2021 | ||
30 | APRIL 07, 2021 | ||
29 | MARCH 26, 2021 | ||
28 | MARCH 22, 2021 | ||
27 | MARCH 17, 2021 | ||
26 | MARCH 15, 2021 | ||
25 | MARCH 05, 2021 | ||
24 | FEBRUARY 23, 2021 | ||
23 | FEBRUARY 15, 2021 | ||
22 | FEBRUARY 11, 2021 | ||
21 | Bid Bulletin No. 21 | SEPTEMBER 23, 2020 | |
20 | Bid Bulletin No. 20 | SEPTEMBER 17, 2020 | |
19 | Bid Bulletin No. 19 | SEPTEMBER 11, 2020 | |
18 | Bid Bulletin No. 18 | AUGUST 25, 2020 | |
17 | Bid Bulletin No. 17 | AUGUST 13, 2020 | |
16 | Bid Bulletin No. 16 | DECEMBER 17, 2019 | |
15 | Bid Bulletin No. 15 | DECEMBER 16, 2019 | |
14 | Bid Bulletin No. 14 | DECEMBER 06, 2019 | |
13 | Bid Bulletin No. 13 | NOVEMBER 28, 2019 | |
12 | Bid Bulletin No. 12 | NOVEMBER 22, 2019 | |
11 | Bid Bulletin No. 11 | NOVEMBER 19, 2019 | |
10 | Bid Bulletin No. 10 | NOVEMBER 11, 2019 | |
09 | Bid Bulletin No. 09 | NOVEMBER 11, 2019 | |
08 | Bid Bulletin No. 08 | NOVEMBER 04, 2019 | |
07 | Bid Bulletin No. 07 | OCTOBER 31, 2019 | |
06 | Bid Bulletin No. 06 | OCTOBER 30, 2019 | |
05 | Bid Bulletin No. 05 | OCTOBER 30, 2019 | |
04 | Bid Bulletin No. 04 | OCTOBER 28, 2019 | |
03 | Bid Bulletin No. 03 | OCTOBER 10, 2019 | |
02 | Bid Bulletin No. 02 | SEPTEMBER 27, 2019 | |
01 | Bid Bulletin No. 01 | SEPTEMBER 17, 2019 | |
EC | CSP Activity | Demand (MW) Energy (MWh) | TOR |
OMECO | Publication of Invitation to Bid Date: September 1 – 10, 2019 | 42 MW (Open Technology) | |
Issuance of Bid Documents Date: September 2 – October 2, 2019 Venue: OMECO Main Office, M.H. del Pilar St., Barangay Poblacion VI, San Jose, Occidental Mindoro | |||
Pre Bidding Conference Date: October 3, 2019 Venue: OMECO Main Office, M.H. del Pilar St., Barangay Poblacion VI, San Jose, Occidental Mindoro | |||
Issuance of Bid Bulletin and Final Instruction to Bidders Date: October 10, 2019 | |||
Due Diligence of Proponent Date: October 11 – 24, 2019 | |||
Submission and Opening of Bids Date: November 6, 2019 | |||
EC Evaluation of Submitted Bids Date: November 7, 2019 | |||
Post Qualification and Detailed Evaluation of Bid Date: November 8 - 22,2019 | |||
Issuance of Notice of Award to Winning Bidder Date: November 23 – 25, 2019 |
BANELCO CSP For 15MW - 15 Years
01 02 03 04 05 06 07 | SUPPLEMENTAL BID BULLETIN NO. 01 SUPPLEMENTAL BID BULLETIN NO. 02 SUPPLEMENTAL BID BULLETIN NO. 03 SUPPLEMENTAL BID BULLETIN NO. 04 SUPPLEMENTAL BID BULLETIN NO. 05 | SEPTEMBER 25, 2019 | ||
EC | CSP Activity | Demand (MW) Energy (MWh) | Contract Period | TOR |
BANELCO | Prequalification and Announcement of Qualified Bidders, thru mail/ text / email Date: August 13-14, 2019 Venue: BANELCO Main Office, Bantayan, Cebu | 15 MW | 15 Years | |
Last Day Issuance of Bidding Documents Date: August 15, 2019 Venue: BANELCO Main Office, Bantayan, Cebu | ||||
Pre Bidding Conference of Qualified Bidders Date: August 16, 2019 Time: 10:00am Venue: BANELCO Main Office, Bantayan, Cebu | ||||
| Deadline for Submission of Comments and Questions on the Bidding Documents of Qualified Bidders Date: August 27, 2019 Venue: BANELCO Main Office, Bantayan, Cebu |
|
|
|
| Last Day of Issuance of Bid Bulletins if Any Date: August 30, 2019 Venue: BANELCO Main Office, Bantayan, Cebu |
|
|
|
| Deadline of Submission and Opening of Bids of Qualified Bidders Date: September 5, 2019 Time: 10:00am Venue: BANELCO Main Office, Bantayan, Cebu |
|
|
|
| EC Evaluation of Submitted Bids Date: September 6, 2019 Venue: BANELCO Main Office, Bantayan, Cebu |
|
|
|
| Post Qualification Date: September 7, 2019 to October 6, 2019 |
|
|
|
| Notice of Award to the Winning Bidder Date: October 11, 2019 |
|
|
|
SORECO II Additional Bid Bulletin Dated July 15, 2019
EC | CSP Activity | Demand (MW) Energy (MWh) | Contract Period | TOR |
SORECO II | Issuance of Bid Bulletin and Final Instructions to Bidders Date: July 15, 2019 | 8 MW (Lot I)
10 MW (Lot II) | 3 years (Lot I)
7 years (Lot II) | As attached |
Due Diligence of Proponent Date: July 16 – 22, 2019 | ||||
Deadline of Submission of Technical and Financial Bids Date: July 23, 2019 Time: 9:30 AM Venue: 3rd Floor, Function Hall, SORECO II Bldg., Monreal St., Talisay, Sorsogon City | ||||
Opening of Technical and Financial Bids Date: July 23, 2019 Time: 10:00 AM Venue: 3rd Floor, Function Hall, SORECO II Bldg., Monreal St., Talisay, Sorsogon City | ||||
Individual Presentation Date: July 24-26, 2019 Venue: 3rd Floor, Function Hall, SORECO II Bldg., Monreal St., Talisay, Sorsogon City | ||||
EC Evaluation on Submitted Bids Date: July 29, 2019 Venue: 3rd Floor, Function Hall, SORECO II Bldg., Monreal St., Talisay, Sorsogon City | ||||
Post Qualification and Detailed Evaluation of Bids Date: July 30 – August 3, 2019 Venue: 3rd Floor, Function Hall, SORECO II Bldg., Monreal St., Talisay, Sorsogon City |
SORECO II CSP For 8MW - 3 Years and 10MW - 7 Years
EC | CSP Activity | Demand (MW) Energy (MWh) | Contract Period | TOR |
SORECO II | Issuance of Bid Documents Date: May 27, 2019 to June 17, 2019 Time: 8:00am to 5:00pm Venue: SORECO II CAMD Office, Monreal St., Sorsogon City | 8 MW (Lot I)
10 MW (Lot II) | 3 years (Lot I)
7 years (Lot II) | |
Submission of Pre-Qualification and Requirements and Announcement of Pre-Qualified Bidders Date: May 18-26, 2019 Venue: SORECO II CPD Office, Buhatan, Sorsogon City | ||||
Publication of Invitation to Bid Date: May 17-26, 2019 Publication: The Manila Times |
ISELCO II TOR AND CSP SCHEDULE FOR 5MW
EC | CSP Activity | Demand (MW)Energy (MWh) | Contract Period | TOR |
ISELCO II | Pre-bid Conference Date: May 7, 2019 Time: 1:00 PM Venue: ISELCO II Office, Alibagu, City of Ilagan, Isabela | 5 MW | 15 years unless earlier terminated in accordance with the provision of the PSA | |
Invitation to Bid (Issuance or Availability of Bid Documents) Date: April 22, 2019 to May 6, 2019 Venue: ISELCO II Office, Alibagu, City of Ilagan, Isabela | ||||
Invitation to Bid (Publication) Date: April 10, 2019 and April 22, 2019 Venue: ISELCO II Office, Alibagu, City of Ilagan, Isabela |
ISELCO II Addendum for 5MW Power Supply Requirement
EC | CSP Activity | Demand (MW) Energy (MWh) | Contract Period | TOR |
ISELCO II | Post Qualification and Detailed Evaluation Of Bids Date: June 3 to 7, 2019 Venue: ISELCO II Office, Alibagu, City of Ilagan, Isabela | 5 MW | 15 years unless earlier terminated in accordance with the provision of the PSA | |
Evaluation on Submitted Bids Date: May 29, 2019 Venue: ISELCO II Office, Alibagu, City of Ilagan, Isabela | ||||
Submission and Opening of Technical and Financial Bids Date: May 28, 2019 Venue: ISELCO II Office, Alibagu, City of Ilagan, Isabela |
ZAMCELCO - Notice of Suspension of CSP
Notice of Suspension of CSP | January 27, 2022 |